Unnamed
Last 5% Remains - ONLY $440 for a 5% lease share in a very well bred ALL TOO HARD filly!
![]()
(GST inclusive)
Trained by:
| Trainer: | Brad Widdup |
|---|---|
| Location: |
Hawkesbury Heights 2777 NSW |
![]()
(GST inclusive)
| Trainer: | Brad Widdup |
|---|---|
| Location: |
Hawkesbury Heights 2777 NSW |
Come race this outstanding filly with Flying Start Syndications - Lease Shares Only $440
Very well bred filly By ALL TOO HARD out of a Black Type Mare EXTENSION OF TIME!
ALL TOO HARD is stallion on FIRE!!!!!!!!!!!!!!
Recently the stallion has produced amazing results...
ALLIGATOR BLOOD - (GROUP 1 WINNER)
DAWN DAWN - (GROUP 2 WINNER)
HARD ROCK GIRL - (LISTED WINNER)
CUBA - (LISTED WINNER)
HURRY SHARES WON'T LAST LONG AT THIS PRICE
ONLY $440 TO RACE A VERY WELL BRED FILLY!
Share price includes breaking in, transport, veterinary costs, PDS & registration fees.
Ongoing costs approx $50 a week for a 5% share
This Filly will be trained by the in form BRAD WIDDUP and will be targeted towards all the big major Black Type races.
FOR MORE INFORMATION OR TO RESERVE YOUR SHARE IN THIS OUTSTANDING FILLY
CALL US TODAY - CAMERON BENNETT (0406 568 500) or JUSTIN ALPAR (0414 836 209)
| ||||
| UNNAMED | ||||
| Bay filly | Foaled 22nd November 2018 | |||
ALL TOO HARD (AUS) (Bay 2009-Stud 2013). 7 wins-3 at 2, ATC All Aged S., Gr.1. Sire of 342 rnrs, 215 wnrs, 16 SW, inc. Alligator Blood (VRC Australian Guineas, Gr.1), Frosted Gold, Villermont, Tarka, Dawn Dawn, Demonetization, Amangiri, Roy's Riviera, Hard Landing, Hard Rock Girl, Behemoth, Unfair Dismissal, All Too Huiying, All Too Royal, Cuba, Curdled, SP Saas Fee, Cristal Eyes, Outrageous, All Too Soon, Hardly Surprising, Superhard, etc.
1st dam EXTENSION OF TIME, by Dash for Cash. 4 wins-3 at 2-to 1300m, A$330,785, SAJC Walter Brown S., L, TTC Magic Millions 2YO Classic, VRC Michael & Goldie Mazur H., SAJC Calvary College Grove 2YO P., 2d MRC Thousand Guineas, Gr.1, TTC Gold Sovereign S., L, 3d MRC ESP Tecforce 2YO P., 4th VRC Edward Manifold S, Gr.2. Half-sister to Levi's Choice. This is her eighth living foal. Her seventh foal is a 2YO. Dam of 6 foals to race, all winners- Time Commands Noble Steed Morrissy Time to Rock Ocean de Lago Mr Deadline - King's Horn (H.K.)
2nd dam NINA HARAKA, by Fraar (USA). 5 wins-1 at 2-from 1000m to 1800m, A$403,390, SAJC Adelaide Guineas, Gr.3, HC Nitschke S., L, Port Adelaide Guineas, L, Advertiser H., Denhoti 2YO H., 2d VATC Vic Health Cup, Gr.1, Toorak H., Gr.1, SAJC Auraria S., Gr.3, Matt Caude 2YO H., Flowers Hyde Park 2YO H., 3d VRC Emirates S., Gr.1, MVRC Australia S., Gr.1, VATC Shankhill Lass H. Sister to Monte Rosa EXTENSION OF TIME (f Dash for Cash) 4 wins. See above. Levi's Choice (g Galileo) 2 wins-1 at 2-at 1400m, 1900m, A$170,950, BRC Ambassador Travel 2YO P., ATC Bacardi World's No. 1 Rum H., 2d ATC South Pacific H., L, Flinders Lane Perfect Fit Shirt H.-twice, 3d BRC Sires' Produce S., Gr.2, NSW Tatt's RC Ming Dynasty H., L, Hawkesbury RC Reavill Farm Inglis Series 2YO H., ATC Echo Entertainment Group H., 4th ATC Shannon S., Gr.2.
3rd dam LA NEBBIA, by Zephyr Bay. Placed, 2d SAJC Lefroy H. Half-sister to Minsky Lass. Dam of 10 foals, 7 to race, 4 winners, inc:- NINA HARAKA (f Fraar) 5 wins. See above. Tennessee Royal PERGRAM (f General Nediym) Winner at 2, SAJC Queen Adelaide S., L, 2d MRC Thomas North P., 4th SAJC Pewsey Vale S., L. Producer. Consistency PRAIRIE FIRE (g Snitzel) 2 wins-1 at 2-at 1050m, 1100m, A$215,850, to 2019-20, VRC Talindert S., L, SAJC Terry Howe Printing H., 3d MRC Chairman's S., Gr.3, VRC Inglis Dash, 4th MRC Blue Diamond S., Gr.1. Monte Rosa SNITZERLAND (f Snitzel) 8 wins-2 at 2-to 1200m, A$1,974,500, VRC Lightning S., Gr.1, Danehill S., Gr.2, ATC Challenge S., Gr.2, VRC Thoroughbred Breeders S., Gr.3, ATC San Domenico S., Gr.3, MVRC Champagne S., Gr.3, MRC (Mornington) Inglis Premier 2YO S., MRC Blue Sapphire S., 2d ATC Golden Slipper S., Gr.1, Galaxy H., Gr.1, Challenge S., Gr.2, VRC Dilmah Earl Grey S., L, Ottawa S., L, 3d BRC Victory S., Gr.2, 4th ATC Reisling S., Gr.2. Dam of 2 winners- HARD LANDING (c All Too Hard) Winner at 2, A$121,500, in 2019-20, VRC Maribyrnong P., Gr.3. SOOBOOG (c Snitzel) 3 wins at 1100m, 1200m, A$272,575, VRC Aurie's Star H., Gr.3, ATC Tab.com.au H., Cellarbrations H., 2d SAJC Euclase S., Gr.2, VRC Goodwood Racecourse Trophy H., L, ATC Breeders' P., L, 4th VRC AR Creswick Series Final S., L. Red Dress Marley (f Hussonet) 2 wins-1 at 2-at 1200m, 1400m, SAJC Allan Scott Park Morphetville H., Peggy McKinnon H., 2d MRC Debutant S., L. Producer. | ||||||||||||||||||||||